Acquisition Log & Part Specification
The vessel has not yet arrived.
In both Zen and Engineering, there is a necessary space between Intention and Reality. We are currently in that space. The asset (2026 Civic Si) is in transit from the manufacturing plant, with an expected arrival of 2025-12-05.
Integrity requires that our records reflect physical truth, not theoretical intent. Until the machine exists in the driveway, this log must remain empty.
Once the vehicle is delivered, this page will transition from a planning document to an immutable log of physical changes. It will serve as the "As-Built" documentation, listing the components that have been installed and integrated into the system.
Current State: WAITING
Next Action: INITIALIZATION